As part of Everest's scope of work, we designed & engineered, manufactured, arranged logistics, and erected EMS-3 warehouse buildings covering an area of over 19,900 square meters.
In the wake of the pandemic, we obtained permission from local authorities, recruited workers, began work during the lockdown with safety precautions for workers, and met the project's timeline. During the erection process, we faced another challenge; a sudden storm with heavy rain and strong winds caused the site roll-forming machine to become damaged. Once again, our erection and project management teams took action, arranging for an alternative machine, and making sure that the roll forming was restarted. This ensured that the roof could be installed on time.
Pre-Engineered steel building